[1]
Zulfa Fitri Ikatrinasari, R.T.O. 2020. Analysis of the Delay in Production Process of Nickel Slider 55 918 with Value Stream Mapping Method in Zipper Manufacturing Industry. International Journal of Advanced Science and Technology. 29, 3 (Feb. 2020), 2825- 2833.