Schedulıng of Machınes and Agvs in FMS Usıng Tabu Search Algorıthm

  • Dr.M.Nageswara Rao, Vara Kumari.S, Md. Yezdan Samad, G. Srinivasa Ravu, B . Jagadeesh, Y Naveen

Abstract

Flexible manufacturing systems (FMS) n - Jobs and m - Machines problem has been attempted in this paper using the Tabu Search Algorithm. Job operations in FMS performed by more than one machine, In FMS Np hard problems are considered computationally. Automated Guided Vehicles (AGVs) are used to transfer the material between machines which are not allowed to return after each delivery from load/unload station. Its objective is to minimize the completion time. Current demand demarcated by needs of the market survive market industries to essential flexibility and ability by FMS. An FMS includes four or more workstations which are connected by electronically controlled material handling and distributed controlled system

Keywords: FMS. AGVs, scheduling, Tabu search Algorithm

Published
2020-06-11
How to Cite
Dr.M.Nageswara Rao, Vara Kumari.S, Md. Yezdan Samad, G. Srinivasa Ravu, B . Jagadeesh, Y Naveen. (2020). Schedulıng of Machınes and Agvs in FMS Usıng Tabu Search Algorıthm. International Journal of Advanced Science and Technology, 29(06), 7002 - 7020. Retrieved from http://sersc.org/journals/index.php/IJAST/article/view/22466